home *** CD-ROM | disk | FTP | other *** search
/ Ron Blank & Associates 7 / Ron Blank & Associates 7.iso / big03a / big03a17.png < prev    next >
Portable Network Graphic  |  2003-07-24  |  98KB  |  700x525  |  16-bit (786 colors)
Labels: monitor | stairs
OCR: Pier Footings Overview Different types of Footings History of footings Pier Footings Development of ithe Bell Footing The most significant differences between pile footing Pre-molded bell and pier are the method of installation, size load footings bearing capacity and the number needed to uoddns the Review loads Several piles are required to support structural References member, whereas only one pier is usually reguired for TEST each Column Cap Piles Pier Piles Soil PREY NEXT> Histor tootnas Beferences Columr PREV